Construction Technology Photo Gallery

Under slab preparation

Raised foundation for a sloped lot

Electrical installation

Fill for concrete floor

Under slab fill for garage floor

Framing contest

1st place team - framing contest

Timed event

Office and garage extension framing

Header to reach from post to post (frame)

Wall and opening layout

Form work

Plumbing installation

T-foundation

Tieing steel for foundation

Plumbing wall

Foundation prep

Foundation prep

Form application

Window treatment for moisture protection

3-story deck framing

Structural panel for engineering calculation

Retaining wall

Steel placement

House wrap

Kitchen cabinets

Framing and truss layout

Framing layout - gable studs

Tiltup as-built wall

Rolling Truss

Site preparation

Sub-floor raised foundation

 

   


About Shasta College      Athletics      Class Schedule     
Employment Opportunities      Events         Foundation      
President's Corner      Staff Directory


©2005-2007 Shasta College - Shasta-Tehama-Trinity Joint Community College District - 11555 Old Oregon Trail - P. O. Box 496006
Redding, CA  96049-6006 - 530.225.4600

Contact us, send web site questions, comments, and suggestions to the Web Team
.
These pages are best viewed in Internet Explorer 6.0 or Netscape Navigator 6.2 or higher.